Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik PT Smart Corporation Surabaya
Author
Go, Tjien Sin
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
-
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 65 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02218/98
L 621.3 GoT L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Pembuatan charger baterai dengan 3 buah mode floating, boost dan equal menggunakan mikroprosesor 8031 dengan monitoring baterai 24V, arus 7A dan suhu 35 C untuk aplikasi baterai lead acid
LKP : PT Dharma Satya Nusantara Surabaya
LKP : PT Buduran Jayatama Sidoarjo