Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pengaman transformator daya 30 MVA 150/20 kV 50 Hz di GIS (Gas Insulated Substation) Waru PT PLN (Persero) Transmisi Surabaya Selatan
Author
Siagian, Janter
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 50 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03062/98
L 621.3 Sia L/E-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : penyediaan energi listrik oleh diesel generator (genset) di PT Mermaid Textile Industri Indonesia (PT Mertex)
Studi penentuan parameter suatu gardu induk secara umum dan khususnya pada GIS 150 KV Wonokromo Surabaya
Perencanaan dan pembuatan single bushing potential transformer 50 VA 20/V3KV/100/V3V class 1,0
Studi pengaman gangguan fasa tanah penyulang 20 kV A. Yani di GI Waru
Studi tentang gardu induk yang menggunakan gas SF6 sebagai media isolasi
Studi tentang instalasi kelistrikan dari transformator daya 1X3 (tiga) phasa, 500/150/20 KV, 500 MVA di Gitet Paiton
Menurunkan tingkat arus harmonisa pada sistem tenaga listrik dengan filter pasif frekuensi tunggal
LKP : PLTU sektor Gresik, Gresik