Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : perencanaan kebutuhan material dengan metode lot for lot
Author
Nugroho, Septiliana
Additional Author(s)
-
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
INVENTORY CONTROL
MATERIALS-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 38 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06376/98
L 670.42 Nug L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : PT Gatra Mapan Jl. Tunjung Tirto1, Karanglo-Malang
Perbandingan metode pengendalian proses dengan menggunakan peta kendali X dan M, R dan s
Identifikasi penyebab keterlambatan pengiriman produk jadi di PT Bahari Mitra Surya dengan analisa manufacturing resource planning (MRP II)
Analisa pengendalian persediaan bahan baku pada perusahaan pengecoran timah PT Noor Sakti Utama di desa Gedangan Sidoarjo
Perancangan sampling penerimaan atribut untuk bahan baku di PT. Agrindo
Penentuan metode lost sixing yang tepat untuk kondisi supply contract with quantity flexibility dan penyusutan bahan baku
Perencanaan kebutuhan material (MRP) pada industri tangki plastik
Perancangan pengendalian persediaan dan tata letak gudang di PT. Aneka Prima