Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : proses produksi di PT Supra Aspindo Jaya
Author
Mario A.H.K.
Additional Author(s)
Stefanus P.M.
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi I
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 54 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06422/98
L 670.42 Mar L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
LKP : PT Universal Wisesa Industry
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
LKP : PT Niko Teknik Surabaya
LKP : PT Indoprima Gemilang Engineering
E-manufacture
LKP : PT MHE Demag