Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : proses produksi di PT Supra Aspindo Jaya
Author
Mario A.H.K.
Additional Author(s)
Stefanus P.M.
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi I
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 54 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06422/98
L 670.42 Mar L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Menurunkan jumlah cycle time di cam shaft line dengan cara menghilangkan muda di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
LKP : PT Buduran Jayatama Steel Surabaya
LKP : bengkel Tjokro Bersaudara Surabaya
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire
Manufacturing operations and supply chain management
LKP : perakitan panel direct on line 1500 KVA pada PT Metro Abdibina Sentosa
Pengukuran efisiensi teknis dan ekonomis dari proses produksi di PT Trias Santosa, Krian