Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Arika Kharisma Agung
Author
Wibianto
Additional Author(s)
Triyudi, Hans
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 52 p.
Dimension
29 cm
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06423/98
L 670.42 Wib L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Peningkatan kualitas produk sandal menggunakan peta kendali p terstandarisasi di PT. Rajapaksi Adyaperkasa
Upaya pencapaian target output mesin injeksi 7 dan penempatan material finishing pada storage area di PT. X
LKP : Pabrik Mesin Kemajuan Malang
Teknologi mekanik
Perencanaan produksi perusahaan sepeda
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Upaya peningkatan kinerja UPPK Petra menggunakan referensi balanced score
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasisws S1 program akunatnsi bisnis