Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Sumber Djaja Perkasa Surabaya
Author
Pangestu, Ichwan Muliono
Additional Author(s)
Ghan, Jenz
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen II
Subject(s)
PRODUCTION PLANNING
SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 40 p.
Dimension
29 cm
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06448/98
L 670.42 Pan L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : PT Ital Fran's Multindofood Industries Surabaya
Perancangan tata letak material berdasarkan pengendalian persediaan di PT Sumber Djaya Perkasa
Peningkatan kapasitas produksi di PT Wangta Agung I
Analisis komponen kritis supply chain management terhadap performance perusahaan
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Perancangan sistem manajemen mutu iso 9001:2000 di PT E-T-A Indonesia (Sidoarjo)
Pengukuran dan analisa kinerja dengan menggunakan metode balanced scorecard di PT. "X"
Perancangan peningkatan produktivitas pada perusahaan aluminium X