Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Conbat Surabaya
Author
Tjia, Tjo Hui
Additional Author(s)
Agustinus
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.003
Subject(s)
ELECTRIC BATTERIES-INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 38 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01919/99
L 621.8 Tji L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Perancangan sistem informasi pada gudang bahan baku di PT. Serasa Purna Cipta
Perancangan fasilitas dan metode kerja yang ergonomis di PT. Friendship.
Just-in-time dalam sistem produksi toyota
Production and operations management
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Meminimalisasi frekuensi downtime pada mesin ayakan pellet 7 di PT Charoen Pokphand Indonesia Feedmill Balaraja
Menentukan sistem perawatan mesin dengan mempertimbangkan faktor biaya di PT. X
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.