Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Aldaco Citra Jaya Krian
Author
Soegiarto, Andy
Additional Author(s)
Samuel
Erwin K., Vincentius
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I no. 98.1.004
Subject(s)
AUTOMOBILES-PARTS-INDUSTRY
MANUFACTURING PROCESSES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
iv, 45 p.
Dimension
28 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01923/99
L 621.8 Soe L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Optimasi cranking ampere aki di PT. Gramitrama Battery Industry
Perencanaan dan pengendalian produksi di Agrindo engineering unit PT. Agrindo
LKP : Bengkel Sanjaya Surabaya
LKP : PT Agrindo Surabaya
LKP : Bengkel Mesin Bersaudara Surabaya
LKP : PT Bhirawa Steel Surabaya
Start up dan optimalization production process at PT Sinar Unigrain Indonesia
LKP : PT Waru Djaja