Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Sentrabumi Palapa Utama Surabaya
Author
Aurelia H., Vike
Additional Author(s)
Tan, Leny
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.16
Subject(s)
AUTOMOBILES-BODIES-INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 30 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01925/99
L 621.8 Aur L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Analisa pengendalian persediaan bahan baku untuk memperlancar proses produksi pada Perusahaan Tegel Dewasa di Madiun
Perancangan agenda operator dan perbaikan modul development sebagai tools dalam pencapaian HPWT di PT X
Perancangan sistem manajemen mutu iso 9001:2000 di PT X
Manajemen operasi produksi
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia
Perancangan sistem suplai tanpa penambahan tempat di PT Toyota Motor Manufacturing Indonesia (PT TMMIN)
Production and operations management
Innovative control charting