Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Sentrabumi Palapa Utama Surabaya
Author
Aurelia H., Vike
Additional Author(s)
Tan, Leny
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.16
Subject(s)
AUTOMOBILES-BODIES-INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 30 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01925/99
L 621.8 Aur L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Pentingnya pengembangan produk dalam usaha meningkatkan volume penjualan pada industri kecil "xy" di Surabaya
A disaggregate freight transport model for Germany
Sentralisasi proses heat treatment di PT. XYZ
Pengukuran dan upaya peningkatan produktivitas di perusahaan kemasan
Perancangan sistem persediaan bahan baku regular di PT E-T-A Indonesia
LKP : PT USFI
LKP : penjadwalan proyek pembuatan tabung pemanas dan pencampur bijih plastik di bengkel konstruksi Sepanjang Baru
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton