Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT ACE Metal Indonesia Surabaya
Author
Purnomo, Handri
Additional Author(s)
Setyawan, Iwan
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I no. 98.1.018
Subject(s)
MANUFACTURING PROCESSES
METAL INDUSTRY AND TRADE
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 31 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01928/99
L 621.8 Pur L-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Perencaan mesin press plat untuk pembentukan diding box pada mobil pick-up dengan sistem hidrolik
Analisa penyebab cacat pada proses pembuatan body valve KTR 1/2
LKP : PT Zindomas Surabaya
Pengoptimalan keuntungan dengan implementasi theory of constraints (TOC) di Bengkel Nenggala Satria Surabaya
Perencanaan kebutuhan bahan baku di PT. Universal Wisesa Industri
LKP : CV United Mesindo
LKP : PT Buduran Jayatama Sidoarjo
LKP : di PT Bhirawa Steel Surabaya