Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Author
Moeljono, David
Additional Author(s)
-
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1146 S
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 34 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03051/03
(T) 690.0683 Moe A
-
Unavailable : Removed
Similar Collection
by author or subject
Construction management of steel construction
Hubungan antara kepuasan kerja dengan motivasi pekerja pada perusahaan kontraktor di Surabaya
Manajemen proyek konstruksi
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)