Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan produktivitas pada line mounting di PT Panggung Electric Corporation
Author
Damaiyanti, Vera
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0731/IND/2003
Subject(s)
PRODUCTION PLANNING
QUALITY CONTROL-STATISTICAL METHODS
TIME MEASUREMENT-STATISTICAL METHODS
WORK MEASUREMENT-STATISTICAL METHODS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04214/03
(T) 658.5 Dam U
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan perencanaan dan pengendalian produksi di CV. Indosurya Mahakam
Perencaaan kebutuhan kertas, grain dan lem resin untuk produk amplas H231 di PT Norton Hamplas Industries
Pengurangan setup dalam usaha pengoptimalan investasi
Penjadwalan produksi menggunakan metode tabu search dengan solusi awal prosedur shifting bottleneck di PT. Agrindo
Penjadwalan produksi, pengaturan penyediaan bahan baku, dan pengaturan pengiriman produk jadi creamer, maizena, dan seasoning di PT. Hakiki Donarta Surabaya
Perancangan manajemen energi gedung perkantoran di PT Kerta Rajasa Raya
Peningkatan kapasitas produksi di PT Wangta Agung I
Pengendalian mutu statistis