Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan produktivitas pada line mounting di PT Panggung Electric Corporation
Author
Damaiyanti, Vera
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0731/IND/2003
Subject(s)
PRODUCTION PLANNING
QUALITY CONTROL-STATISTICAL METHODS
TIME MEASUREMENT-STATISTICAL METHODS
WORK MEASUREMENT-STATISTICAL METHODS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04214/03
(T) 658.5 Dam U
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan tingkat kecacatan proses pengelasan pada fabrikasi piping duplex stainless steel proyek bp tangguh di PT Gunanusa Utama Fabricators
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"
Perencanaan kebutuhan bahan baku dan pengendalian produksi dalam usaha pemenuhan permintaan di PT. Mega Citra First
Sistem pengendalian stuffle, loss process dan finished product di departemen kawat-seksi drawing PT. Surabaya Wire
Implementasi sistem manajemen mutu ISO 9001:2000 di PT. E-T-A Indonesia
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia