Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran kinerja operator packer di divisi B III untuk menunjang perencanaan kerja yang lebih efektif di PT. xXx
Author
Soetomo, Marcus
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0737/IND/2003
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT-STATISTICAL METHODS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04216/03
(T) 658.5 Soe P
-
Unavailable : Removed
Similar Collection
by author or subject
Production scheduling using backward scheduling method in job shop system study case at Schneider Indonesia Ltd.
Peningkatan produktivitas dengan minimalisasi aktivitas non-productif pada industri corrugated carton box PT. Lestari Karya Makmur
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle
Cellular manufacturing one-piece flow for workteams
Perancangan modul sebagai tools dalam penerapan hpwt di PT "X"
Perencanaan kebutuhan bahan baku di PT. Trijaya
Quality function deployment
Perbaikan lini produksi untuk peningkatan kapasitas pada PT. XYZ