Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perbandingan penggunaan energi listrik antara suplai listrik dan generator set di PT. Industri Sandang Nusantara unit II Lawang
Author
Sindhuatmadja, Harris
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/453/ELK/2003
Subject(s)
ELECTRIC POWER DISTRIBUTION
ELECTRIC POWER SYSTEMS
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 118 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00321/04
(T) 621.319 Sin S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Electric power distribution system engineering
Perencanaan instalasi listrik dan panel listrik menggunakan ecodial 3.3 pada pabrik coklat dengan daya 197 kva di Surabaya
LKP : Perencanaan, assembling dan pengujian panel tegangan menengah di PT. Schneider Indonesia
Studi over current relay gangguan tiga fasa penyulang bilka 20 kv di gardu induk Ngagel
LKP : Susunan gardu induk outdoor 150 kV sampai 70 kV dan PMT untuk gardu induk outdoor di gardu induk Waru
Studi tentang power supply untuk hotel-hotel bertingkat (sembilan tingkat atau lebih) di Surabaya
Studi harmonisa egangan dan arus di gedung A Universitas Kristen Petra
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida