Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kinerja melalui implementasi rekomendasi peda pt. xyz dengan metode balanced scorecard.
Author
Gozali, Rudy
Additional Author(s)
Sienny Kusuma
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0768/IND/2004
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xx, 271 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00514/04
(T) 658.5 Goz P
-
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan produksi menggunakan metode tabu search dengan solusi awal prosedur shifting bottleneck di PT. Agrindo
Improving the performance of maintenance department in PT Doulton
Perencanaan produksi agregat dengan formulasi fuzzy di PT. XYZ
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Penggunaan metode MRP dalam penentuan starting date dan released date pada produk training pack di perusahaan konveksi pakaian jadi Gin's collection
Inventory management and production planning and scheduling
The power of business process improvement
LKP : PT Surya Indah Wood Industries Desa Tanjungan-Driyorejo Gresik