Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan fasilitas kerja pemindahan asbes di pt. "x".
Author
Henry, Azis
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0750/IND/2003
Subject(s)
FACTORY MANAGEMENT
PLANT LAYOUT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/04
(T) 658.2 Hen P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Ace Metal Indonesia
Peningkatan efisiensi man power melalui pencapaian line balancing dan perbaikan process flow pada spin on filter assembly line 2 di PT X
Analisa fasilitas dan perencanaan tata letak untuk memperbesar kapasitas produksi pada ruang perautan kayu
Perancangan tata letak fasilitas pabrik pemotongan kayu di UD Gelis Gede Surabaya
Optimalisasi tata letak lantai produksi snc PT. SEMB PEM
Facilities design
Upaya peningkatan produktivitas dengan pengukuran kapasitas dan perancangan layout di PT FSCM Manufacturing Indonesia divisi kabel
The design of the factory with a future