Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Author
Saptarini, Dyah Wahyuti
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tesis No. 061/MTS/2003
Subject(s)
CONSTRUCTION INDUSTRY-FINANCE
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00702/04
(T2) 690.068 Sap F
-
Unavailable : Removed
Similar Collection
by author or subject
Building management by professionals
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Produktivitas tower crane pada apartemen
Studi tentang komponen-komponen yang terdapat dalam tahapan-tahapan pengembangan perumahan oleh PT."X" di makassar
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja