Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Author
Saptarini, Dyah Wahyuti
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tesis No. 061/MTS/2003
Subject(s)
CONSTRUCTION INDUSTRY-FINANCE
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00702/04
(T2) 690.068 Sap F
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
Studi mengenai penerapan manajemen risiko oleh perusahaan kontraktor di Surabaya
Evaluasi kinerja bangunan dengan ketidakberaturan sudut dalam yang direncanakan secara direct displacement based design
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Construction extension to the PMBOK guide third edition
Perhitungan produktivitas tenaga kerja pada pekerjaan pembesian dengan metode level of effort (studi kasus pada proyek X dan Y)