Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu lembur pada PT. Industri Kemasan Semen Gresik
Author
Rahardjo, Tjipto
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0683/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01159/04
(T) 658.542 Rah P
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan leadtime proses pengiriman ekspor barang dengan penggunaan value stream mapping pada divisi sales OEM di PT. X
Upaya peningkatan output produksi di PT X
Pengukuran kinerja perusahaan distributor kabel menggunakan metode balanced scorecard
Pengidentifikasian waste melalui value stream mapping dan upaya pengurangan waste pada Departemen PK PT X
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Perancangan sistem pengendalian bahan baku sepatu di CV Sinar Terang
Analisis produktivitas kerja pada PT. Berkat Anugerah Raya
Perencanaan kebutuhan bahan baku pada PT "X" di Surabaya