Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu lembur pada PT. Industri Kemasan Semen Gresik
Author
Rahardjo, Tjipto
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0683/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01159/04
(T) 658.542 Rah P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Tulus Tri Tunggal
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
LKP : UD Cipta Jaya
Minimization the occurences of NQP cubicle in sm6 assembly line at PT. Schneider Electric Indonesia
Manajemen produksi dan operasi
Kaizen for the shopfloor
Usulan improvement moulding plan di PT. X
Peningkatan produktivitas di PT Cipta Alam Indah