Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Strategic management of human resources
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Peranan pemimpin dalam meningkatkan produktivitas karyawan pada PT. Panca Wana Indonesia
Studi kelayakan Galaxi Mall ditinjau dari aspek pasar dan keuangan
Analisa hubungan ketergantungan antara efektivitas komunikasi, stres kerja dan produktivitas pada PT. Mentari Massen Toys Indonesia di Jombang
Management by projects
The structuring of build-operate-transfer construction projects
Project management