Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi studi kelayakan aspek keuangan proyek pusat perbelanjaan megamall Manado
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Analisa keputusan
Peranan manajer proyek sebagai pemimpin dalam membangun kepercayaan pada proyek konstruksi di Surabaya
Faktor-faktor yang dapat menciptakan keunggulan bersaing bagi pengembang Ruko di Surabaya
Analisa pengaruh pemberian upah dan tingkat absensi terhadap produktivitas karyawan bagian produksi PT Karyayudha Tiaratama
Upaya peningkatan produktivitas pekerja bagian ring frame Departemen Spinning di PT. Lotus Indah textile industri