Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Project evaluation and procurement case studies
Peranan motivasi bagi karyawan dalam upaya meningkatkan produktivitas kerja di PT. Kedaung Indah Can Surabaya
Pemakaian indeks dan kompensasi akibat inflasi pada perusahaan konstruksi
Successful project management for A/E/P and environmental consulting firms
Studi kelayakan pada suatu Pusat Pembelanjaan "X3" di Surabaya
Studi kelayakan untuk pembangunan ruko di Perumahan Citra Raya Surabaya
Information systems project management
Peran pemimpin dalam meningkatkan produktivitas karyawan PT. Adaya Multi Indoteknik