Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa konfik dalam perusahaan kontraktor
Successful project management for A/E/P and environmental consulting firms
Studi tentang produktivitas kelompok pekerja pada pekerjaan pasangan bata di proyek perumahan
Analisa faktor-faktor yang mempengaruhi strategi perusahaan yang berdampak pada penetapan harga produk realestate di Surabaya
Analisis korelasi antara kepuasan terhadap gaya kepemimpinan dan produktivitas kerja karyawan di PT "X" Surabaya
Management of printing production
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Studi komparatif kinerja tenaga kerja normal dan tenaga kerja penyandang cacat pada UD. Tiara Handicraft di Surabaya