Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa labor utilization rate pada proyek "X" dan "Y" dengan menggunakan metode worksampling
Author
Wibowo, Koento Danny
Additional Author(s)
Prasetya, Andri
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1319/SIP/2004
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
LABOR PRODUCTIVITY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01383/04
(T) 658.404 Wib A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Pengelolaan sumber daya manusia dalam meningkatkan produktivitas karyawan pada PT. Garuda Mas, Manado
Peranan studi kelayakan pada perluasan usaha pabrik pengecoran baja "X" di Gresik
Pengaruh pelatihan dan insentif terhadap peningkatan produktivitas kerja PT Moriah Ciptasembada
Pengendalian pelaksanaan struktur gedung bertingkat untuk menghasilkan cara kerja yang efektip
Analisis peran pemimpin dalam meningkatkan produktivitas karyawan (studi kasus PT. Queen Snack, Pandaan)
Strategic management of human resources
Analisa change order dalam proyek konstruksi