Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perencanaan setting ATS (Automatic Transfer Switch) penyulang 1 dan penyulang 2 terhadap optimalisasi pembebanan pelanggan potensial di PLN distribusi Jawa Timur
Author
Susanto, Hendy Agustin
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/474/ELK/2003
Subject(s)
ELECTRIC POWER DISTRIBUTION
ELECTRIC POWER TRANSMISSION
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 116 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01594/04
(T) 621.319 Sus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi harmonisa pada utilitas listrik perumahaan yang disebabkan oleh beban nonlinier
LKP : PT Triguna Adhi Electro Surabaya
Studi analisa kualitas pendistribusian tenaga listrik pada PT. Tjiwi Kimia dengan turut memperhatikan beban prioritas dan non-prioritas yang disuplai
Analisa instalasi listrik plant 1 biskuit di PT. Garudafood Putra Putri Jaya desa Krikilan 28 Driyorejo Gresik
LKP : Sahid Surabaya Hotel Surabaya
Electric vehicle machines and drives :
Studi perencanaan instalasi dan distribusi gedung ekonomi Universitas Kristen Petra
Studi kualitas daya listrik di PT. Indofood Sukses makmur