Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan setup dalam usaha pengoptimalan investasi
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
Dampak peranan konsultan, komitmen manajemen, dan user controller terhadap kinerja perusahaan melalui implementasi TQM
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
Pengukuran kinerja perusahaan dengan menggunakan kriteria malcolm baldrige national quality award dan usulan perbaikan di pt. bumi menara internusa
Perencanaan kebutuhan bahan baku dan pemilihan supplier di PT. Indonesia multi Colour Printing
Diskriminasi struktur proses produksi dalam domain frekuensi dengan menggunakan transformasi fast fourier serta prngujian kolmogorof smirnov
Relokasi pabrik filter dengan mempertimbangkan perencanaan produksi filter di PT Nojorono Tobacco International