Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan pengukuran standar kinerja Puskesmas pemerintah kota Surabaya dengan mbnqa
Evaluasi kegagalan balanced scorecard pada unit bisnis sebuah perusahaan elektronik
Perbandingan performance anatara algoritma NEH, BaBH dan DPH dengan kriteria minimal Makespan
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasisws S1 program akunatnsi bisnis
Upaya penurunan jam kerja Reconstituted Tobacco Clove (RTC) line di primary processing department PT HM Sampoerna, Tbk
Perancangan dan pengukuran kinerja perusahaan kaca dengan metode performance prism
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa
Analisa produktivitas tenaga kerja di pt x