Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa perencanaan persediaan di PT. Surya Kertas
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.
Niebel's methods, standards, and work design
Perencanaan bahan baku dan penjadwalan proses produksi di production training centre (PTC)
Perencanaan produksi cat tembok di PT. Warnatama Cemerlang
Perancangan keseimbangan lintasan untuk meningkatkan kapasitas produksi pada perusahaan meja setrika
Penjadualan mesin paralel dengan metode dinamis fun (fuzzy-neuro) di PT Supra Aspindo Jaya