Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan metode lot for lot policy after stage 1 dan forecast beyond the planning horizon untuk perencanaan kebutuhan material di PT Golden Rubberindo
Perancangan keseimbangan lintasan untuk proses perakitan timbangan dengan menggunakan algoritma genetik pada perusahaan timbangan "SSS" di Surakarta
Optimalisasi jumlah kebutuhan tenaga kerja dengan menggunakan metode line balancing di PT X
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
LKP : PT Kerta Rajasa Raya
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri
Analisa tata letak ruang Gedung K lantai dasar Universitas Kristen Petra