Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Author
Halim, William Stephanus
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0804/IND/2004
Subject(s)
PRODUCTION PLANNING
TIME STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02040/04
(T) 658.5 Hal A
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
Perencanaan dan pengendalian produksi di Agrindo engineering unit PT. Agrindo
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal
Analisa produktivitas di CV. Dirgahayu
Analisa tata letak ruang Gedung K lantai dasar Universitas Kristen Petra
Perancangan sop dan pengukuran kinerja fungsi logistik pada departemen spinning di PT. Lotus Indah Textile Industries