Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Author
Lapu', Andarias Sanda
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir S2 No. 068/MTS/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONTRACTORS OPERATIONS
INDUSTRIAL PROJECT MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02255/04
(T2) 658.924 Lap S
-
Unavailable : Removed
Similar Collection
by author or subject
Etika bisnis konstruksi
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Pandangan kontraktor terhadap klausul-klausul kontrak pada proyek konstruksi
Analisa perbandingan nilai produktivitas tenaga kerja dengan menggunakan metode standard dan aktual (studi kasus pada proyek X dan Y)
Peranan studi kelayakan pada perluasan usaha pabrik pengecoran baja "X" di Gresik
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Case study of concession contract in the public private partnership