Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Author
Lapu', Andarias Sanda
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir S2 No. 068/MTS/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONTRACTORS OPERATIONS
INDUSTRIAL PROJECT MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02255/04
(T2) 658.924 Lap S
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa sumber dan jenis informasi marketing intellegence yang diperlukan dalam penawaran tender kontraktor
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Construction methods and management
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
The impact of value engineering in the design and construction process
Sistem administrasi shop drawing
Buildings and health
Construction contracting