Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Author
Lapu', Andarias Sanda
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir S2 No. 068/MTS/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONTRACTORS OPERATIONS
INDUSTRIAL PROJECT MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02255/04
(T2) 658.924 Lap S
-
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan bisnis
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Faktor-faktor pengendali adaptasi bangunan pada kawasan sentra bisnis di Surabaya
Studi kasus mengenai struktrur organisasi pelaksana lapangan pada proyek konstruksi di Surabaya
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Time, cost and architecture
Pengaruh dilatasi pada bangunan dengan ketidakberaturan sudut dalam yang didesain secara direct displacement based
Kontrol material pada proyek konstruksi perumahan