Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi awal supply chain management pada kontraktor-kontraktor di Surabaya
Author
Lapu', Andarias Sanda
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir S2 No. 068/MTS/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONTRACTORS OPERATIONS
INDUSTRIAL PROJECT MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02255/04
(T2) 658.924 Lap S
-
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Cara pendekatan perhitungan kuantitas pembesian pada balok struktur beton bertulang
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Studi kelayakan pendirian jurusan musik pada Fakultas Seni dan Desain Universitas Kristen Petra
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi