Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi pengaturan frekuensi generator (Governor) di PLTA Selorejo 5600 kVA
Author
Sidauruk, Rio Pandapotan
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010497/ELK/2004
Subject(s)
HYDROELECTRIC POWER PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 90 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02510/04
(T) 621.312134 Sid S
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Proyek PLTA
Analisa pemodelan PLTA sengguruh dengan Matlab Simulink
Perancangan pembangkitan listrik tenaga mikrohidro (PLTMH) dengan tegangan 220 VAC, daya 1 kw di desa Jembul, kecamatan Jatirejo, kabupaten Mojokerto
PLTMH (Pembangkit Listrik Tenaga Mikro Hidro)
Pembangkit listrik tenaga air
Studi kinerja PLTA di DAS (Daerah Aliran Sungai) Brantas
Perancangan dan pembuatan turbin air sebagai pembangkit listrik 750 watt pada sungai hidrokinetik
Studi pengoperasian dan perawatan PLTA Selorejo 5600 kVA