Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan eksperimen bumbu rujak petis instan powder dengan metode Taguchi
Operations management
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia
Upaya meminimalkan non value added activity pada gudang bahan baku dan buhler dengan metode lean manufacturing di PT Japfa Comfeed Indonesia Tbk. unit Sidoarjo
Peranan pengembangan produk dan promosi untuk meningkatkan volume penjualan PT Sumber Yalasamudra
LKP : PT Hapete Jalan Margomulyo Indah Surabaya-Jawa Timur
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
The six sigma way team fieldbook