Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Operations management
Operations and supply chain management
Minimization the occurences of NQP cubicle in sm6 assembly line at PT. Schneider Electric Indonesia
SPC essentials and productivity improvement
Manajemen produksi dan operasi
Meminimalisasi frekuensi downtime pada mesin ayakan pellet 7 di PT Charoen Pokphand Indonesia Feedmill Balaraja
Peningkatan produktivitas di PT. Panggung Electronic Corporation
Penentuan strategi reduksi material besi beton berdiameter 16 mm dengan bahan TP24 di PT Segoro Adidaya Steel