Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan ramalan penjualan dalam meningkatkan efisiensi dan efektifitas produksi di perusahaan "X"
Peranan anggota keluarga dalam pengelolaan bisnis keluarga (studi deskriptif pada proses manajemen produksi dan operasional)
Pengendalian proses sizing udang di PT Sumber Bahari Prima
Perencanaan dan pengendalian produksi giverny 5' bench di CV Tri Star
Penjadwalan produksi dan pengendalian persediaan dengan tujuan optimalisasi biaya produksi pada divisi paku PT Surabaya Wire (suatu pendekatan program dinamis)
E-supply chain
Topics in just-in-time management
Perbaikan quality assurance di PT FSCM Manufacturing Indonesia