Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Perancangan sistem perencanaan produksi dan pengendalian persediaan di PT. XYZ
Upaya penurunan tingkat kecacatan di PT Halim Jaya Sakti
Analisis produktivitas kerja pada PT. Berkat Anugerah Raya
Lean performance erp project management
Estimasi penghematan biaya dan perancangan standarisasi kerja pada produksi air cleaner di PT. Astra Otoparts divisi adiwira plastik
Manajemen dan organisasi produksi
Perbaikan fasilitas kerja dan perancangan metode kerja dengan memperhatikan aspek ergonomi di pt jatim bromo steel