Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja bagian soda plant di PT. Suparma Tbk
Author
Teerta, Fangliana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040822/IND/2004
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
WORK MEASUREMENT-ANALYSIS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 116 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02532/04
(T) 658.542 Tee P
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Perancangan pengendalian inventory system di PT X Surabaya
Upaya peningkatan uptime mesin mentholator di PT H. M. Sampoerna Tbk
Speed to market
Usulan improvement moulding plan di PT. X
Peningkatan produktivitas di PT. Panggung Electronic Corporation
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International