Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi penyebab keterlambatan pengiriman produk jadi di PT Bahari Mitra Surya dengan analisa manufacturing resource planning (MRP II)
Author
Chandra, Lydia
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010832/IND/2004
Subject(s)
INVENTORY CONTROL
PRODUCTION PLANNING
MANUFACTURING RESOURCE PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02856/04
(T) 658.5038 Cha I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Identifikasi keterlambatan pengiriman produk departemen produksi extrussion blow molding di PT X Surabaya
Perancangan restaurant specialist nasi goreng di salah satu kawasan Surabaya Barat
Strategi peningkatan kapasitas produksi di PT. Surya Aluminium
Usulan penentuan rute pengiriman barang di PT Aries Centaurus pada kasus vehicle routing problem with time windows dengan alogaritma tabu search
Rancangan sistem perencanaan produksi dan pengendalian persediaan dengan mempertimbangkan efisiensi biaya pada PT X
Analisis pengendalian persediaan bahan baku pada pabrik tegel Wiratama Surabaya
Perancangan produksi dan pengendalian persediaan di UD. Kompas