Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.
Author
Jaya, Andri Subiyanto
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/01812/IND/2004
Subject(s)
PERSONNEL MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 137 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02860/04
(T) 658.542 Jay P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan lintasan CU dengan metode line balancing di PT. XYZ
Developing human capital
Analisis produktivitas contractual labor pada general affair department, maintanance department, engineering department, dan production 1 department di PT X
Tenaga kerja dan pembangunan
Peranan pelatihan kerja terhadap penilaian prestasi kerja karyawan non produksi di PT. Untung Bersama Sejahtera (UBS)
LKP : peningkatan kualitas sumber daya manusia PT Pamargha Indojatim Surabaya
Perencanaan perbaikan proses administrasi dan analisis kebutuhan operator proses produksi PG 1160 do PT E-T-A Indonesia
Analisis pelaksanaan pelatihan dan pemberian kompensasi bagi karyawan pada yayasan pendidikan kristen sunodia di Samarinda, kalimantan Timur