Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
Author
Lisyana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040831/IND/2004
Subject(s)
INDUSTRIAL EFFICIENCY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xix, 316 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03721/04
(T) 658.54 Lis P
-
Unavailable : Removed
Similar Collection
by author or subject
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Made-to-order lean
RSX production line analysis with line architecture design methodology in PT. Schneider Electric Manufacturing Batam
In the age of the smart machine
Managing the efficient use of materials
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can
Evaluasi dan peningkatan implementasi 5S pada gudang satu sampai tiga di PT. Spindo unit 1
Peningkatan efisiensi dan analisa loss pada departemen kawat-bagian drawing PT. Surabaya Wire