Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk.
Author
Lisyana
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040831/IND/2004
Subject(s)
INDUSTRIAL EFFICIENCY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xix, 316 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03721/04
(T) 658.54 Lis P
-
Unavailable : Removed
Similar Collection
by author or subject
Penggunaan aspek-aspek teknis dan ekonomis sebagai dasar pengukuran tingkat efisiensi di PT Schering Plough Indoensia
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
Made-to-order lean
Analisa tingkat efisiensi PDAM di propinsi NTB dengan menggunakan metode data envelopment analysis (DEA)
Menghitung eco-efficiency PT. Apie Indo Karunia
Peningkatan efisiensi dan analisa loss pada departemen kawat-bagian drawing PT. Surabaya Wire
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can
The ten commandments of lean six sigma