Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi di PT Wangta Agung I
Author
Dewi, Henny Meliza
Additional Author(s)
Engeline
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01040864/IND/2004
Subject(s)
INDUSTRIAL MANAGEMENT
INVENTORY CONTROL
MOTION STUDY
PRODUCTION PLANNING
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 266 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03723/04
(T) 658.5 Dew P
-
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan inventory accuracy dengan meninjau ulang error handling report secara periodik di PT Schneider Electric Manufacturing Batam
Pengalokasian operator pada lantai produksi PT X
Mastering the dynamics of innovation
Disposal management system PT "X"
Motion and time study
Peranan pengendalian persediaan bahan baku ditinjau dari segi penggunaan dana pada perusahaan PT United Waru Biscuit Manufacturing Sidoarjo
Make-up buy analysis dalam pengadaaan packing set di PT. Dhemar Nusantara
Achieving 100% compliance of policies and procedures