Library's collection Library's IT development CancelSchneider Electric Indonesia Ltd .is implementing Lean Sigma concept
as it?s production system for continuous improvement. With these concept, PT.
SEI wants to satisty customer with a good quality product, on time delivery, and
has an efficient line production to increase the profit. Right now Low Voltage
(LV) line production has an extreme variation due to the variation in customer?s
demand for Blokset panel. It makes the line leader difficult to estimate the number
of operator in each workstation. The author is focusing in busbar and power
connection assy only due to the time limitation. The goal of this final project is to
calculate the appropriate number of operator for busbar and cable power
connection assy and finally it will improve LV line productivity.