Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam

This final project is focused on kanban implementation to increase labor
productivity at PT Schneider Electric Manufacturing Batam. This final project is
divided into four steps: design kanban, do implementation, make analysis and the
last do improvement based on analysis that has done. The result from kanban
implementation is success to increase labor productivity. It is increased around 14
% after kanban implementation.

Creator(s)
  • (25404039) FERDIANTO WIJAYA
Contributor(s)
  • Tanti Octavia → Advisor 1
  • PHILIPPE BICHON → Advisor 2
  • ADI WIDIADI → Advisor 3
  • Togar Wiliater Soaloon Panjaitan, S.T., MBA. → Examination Committee 1
  • WIRA SATRIA → Examination Committee 2
Publisher
Universitas Kristen Petra; 2008
Language
English
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 01041304/IND/2008; Ferdianto Wijaya (25404039)
Subject(s)
  • PRODUCTION MANAGEMENT
  • LABOR PRODUCTIVITY
File(s)

Similar Collection

by creator, contributor, or subject