Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
-
Creator(s)
(31493502) DEWI
Contributor(s)
Hasan Oetomo → Advisor 1
Thomas Santoso → Examination Committee 1
Publisher
Universitas Kristen Petra; 1997
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 897/EM/1997; Dewi (31493502)
Subject(s)
PRODUCTION MANAGEMENT
File(s)
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-cover.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-abstract_toc.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter1.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter2.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter3.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter4.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter5.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-conclusion.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-references.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-appendices.pdf
Similar Collection
by creator, contributor, or subject
Pengaruh gaya kepemimpinan terhadap komitmen karyawan pada PT Bersama Kita Sukses
Analisis faktor-faktor yang mempengaruhi keputusan konsumen dalam memilih Salon Rudy Hadisuwarno di Mal Galaxi Surabaya
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
Perencanaan peramalan dan penjadualan di PT Multi Global Makmur
Upaya penurunan
downtime
pada mesin moulding di PT X
Usulan improvement moulding plan di PT X
Penurunan bottleneck di PT XYZ dengan pendekatan simulasi
Penurunan tingkat kecacatan di PT Bondi Syad Mulia