Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
-
Creator(s)
(31493502) DEWI
Contributor(s)
Hasan Oetomo → Advisor 1
Thomas Santoso → Examination Committee 1
Publisher
Universitas Kristen Petra; 1997
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 897/EM/1997; Dewi (31493502)
Subject(s)
PRODUCTION MANAGEMENT
File(s)
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-cover.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-abstract_toc.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter1.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter2.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter3.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter4.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-chapter5.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-conclusion.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-references.pdf
jiunkpe-ns-s1-1997-31493502-14017-rimba_kencana-appendices.pdf
Similar Collection
by creator, contributor, or subject
Analisa pengaruh knowledge management terhadap kinerja karyawan di Hotel Nirwana Bojonegoro
Studi deskriptif tentang rekrutmen dan seleksi pegawai di PT. Bukit Surya Indah Permai
Evaluasi penilaian 5s di area penyimpanan proyek konstruksi
Upaya peningkatan produktivitas melalui proyek continuous improvement pada line Y di PT Z
Perancangan perbaikan kualitas produk di Pt. Covina Industri Italindo
Analisis quality control dibagian produksi pada PT Galaxy Perkasa
Meminimalisasi downtime pada mesin ayakan pellet 7 di PT Charoen Pokphand Indonesia Feedmill Balaraja
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia