Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peranan studi kelayakan pada perluasan usaha pabrik pengecoran baja "X" di Gresik
-
Creator(s)
(31488052) HARYONO SOERYANI
Contributor(s)
-
Publisher
Universitas Kristen Petra; 1994
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 240/EM/1994; Soeryani Haryono (31488052)
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT
File(s)
jiunkpe-ns-s1-1994-31488052-21369-baja-cover.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-abstract_toc.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-chapter1.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-chapter2.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-chapter3.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-chapter4.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-conclusion.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-references.pdf
jiunkpe-ns-s1-1994-31488052-21369-baja-appendices.pdf
Similar Collection
by creator, contributor, or subject
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Analisis faktor-faktor organisasi yang mempengaruhi kesuksesan proyek
Program komputer untuk penempatan menara angkat tunggal
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Aplikasi material requirement planning untuk mengendalikan investasi pengadaan material pada PT. JHS Pilling System
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi
Penerapan metode cpm dalam perencanaan dan pengendalian jadwal proyek: Studi kasus perluasan bangunan pabrik