| The History of bridges- Author(s)
- -
- ISBN
- -
- Dimension
- 1 Digital Video Disc / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02427/11 | DVD 624.2 His | Library - 5th Floor/ AV | Available |
| |
| Foundations for buildings- Author(s)
- -
- ISBN
- -
- Dimension
- 1 Digital Video Disc / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02435/11 | DVD 624.15 Fou | Library - 5th Floor/ AV | Available |
| |
| Foundation failure and repair- Author(s)
- -
- ISBN
- -
- Dimension
- 1 Digital Video Disc / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02433/11 | DVR 690.21 Fou | Library - 5th Floor/ AV | Available |
| |
| Eurocode 7 - geotechnical design- Author(s)
- -
- ISBN
- -
- Dimension
- 1 Digital Video Disc / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02436/11 | DVD 624.02 Eur | Library - 5th Floor/ AV | Available |
| |
| Penentuan jumlah, alokasi kebutuhan tenaga kerja, dan job description pada proses ring frame di PT. Lotus Indah Textile Industries Surabaya- Author(s)
- Jiemesha, Felix
- ISBN
- -
- Dimension
- xii, 58 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02412/11 | 658.306 Jie P | - | Unavailable : Removed |
| |
| Penyelesaian capacitated vehicle routing problem pada PT Go Trans Logistics International Surabaya dengan algoritma hybrid particle swarm optimization- Author(s)
- Novalina, Lidya
- ISBN
- -
- Dimension
- xii, 74 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02413/11 | 658.7882 Nov P | - | Unavailable : Removed |
| |
| Perancangan logistik barang non-elektronik di Universitas Kristen Petra- Author(s)
- Winoto, Shienny Aprilia
- ISBN
- -
- Dimension
- xiii, 121 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02414/11 | 658.515 Win P | - | Unavailable : Removed |
| |
| Pengendalian persediaan alat-alat teknik di PT X- Author(s)
- Sutiono, Anthony Nyoto
- ISBN
- -
- Dimension
- xi, 78 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02415/11 | 657.787 Sut P | - | Unavailable : Removed |
| |
| The Frontiers of project management research- Author(s)
- -
- ISBN
- 1880410745
- Dimension
- xii, 503 p. / 36 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02277/11 | 658.404072 Fro | Library - 7th Floor | Available |
| |
| Allies in healing- Author(s)
- Davis, Laura
- ISBN
- 9780060968830
- Dimension
- xii, 350 p. / 23 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02271/11 | 616.85836 Dav A | Library - 7th Floor | Available |
| |
| Pengembangan dokumen Hazard Identification Risk Assessment and Risk Controll (HIRARC) di PT. Schneider Electric Indonesia berdasarkan standar OHSAS 18001 : 2007- Author(s)
- Sugiarto, Dessynthia
- ISBN
- -
- Dimension
- xiii, 81 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02411/11 | 658.382 Sug P | - | Unavailable : Removed |
| |
| Perencanaan mesin perajang tembakau yang aman, efisien, efektif- Author(s)
- Saputra, Guntur
- ISBN
- -
- Dimension
- xi, 40 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02438/11 | 658.815 Sap P | - | Unavailable : Removed |
| |
| Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia- Author(s)
- Jonatan, Ricardo Valentino
- ISBN
- -
- Dimension
- xi, 59 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02439/11 | 658.5 Jon I | - | Unavailable : Removed |
| |
| Penurunan tingkat kecacatan produk di PT X- Author(s)
- Njoo, Djiu Yen
- ISBN
- -
- Dimension
- xvi, 135 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02440/11 | 658.562 Njo P | - | Unavailable : Removed |
| |
| Analisa non-value added activity dengan menggunakan konsep activity based management untuk mencapai efisiensi biaya di CV. XYZ- Author(s)
- Nawir, Meike
- ISBN
- -
- Dimension
- xvii, 209 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02432/11 | 657.42 Naw A | - | Unavailable : Removed |
| |
| Upaya penurunan downtime pada mesin winding di PT. Lotus Indah Textile Industries Surabaya- Author(s)
- Poernomo, Tingkir
- ISBN
- -
- Dimension
- xii, 45 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02434/11 | 658.56 Poe U | - | Unavailable : Removed |
| |
| Perancangan perbaikan program perawatan mesin tube mill di PT Spindo unit I- Author(s)
- Khristina, Firda
- ISBN
- -
- Dimension
- xv, 126 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02437/11 | 621.816 Fir P | - | Unavailable : Removed |
| |
| Make or buy analysis dalam memenuhi permintaan produk dari mesin injection di PT Asia Pramulia- Author(s)
- Siswanto, Zendy
- ISBN
- -
- Dimension
- xii, 55 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02428/11 | 658.15 Sis M | - | Unavailable : Removed |
| |
| Rancangan logistik barang elektronik di Universitas Kristen Petra- Author(s)
- Halim, Lusiana
- ISBN
- -
- Dimension
- xiv, 93 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02430/11 | 658.515 Hal R | - | Unavailable : Removed |
| |
| Kelayakan penambahan kamar hotel untuk sarana praktek mahasiswa manajemen perhotelan- Author(s)
- Anganata, Lita
- ISBN
- -
- Dimension
- xiv, 74 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 02456/11 | 658.152 Ang K | - | Unavailable : Removed |
| |