Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Author
Jonatan, Ricardo Valentino
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021517/IND/2011
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix : p. 46 - 59
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02439/11
(T) 658.5 Jon I
-
Unavailable : Removed
Similar Collection
by author or subject
Penurunan tingkat kecacatan di PT. Mitra Anugrah
Standarisasi lintasan kerja penjahitan sepatu pada PT. XYZ
Analisis persediaan spare parts di PT H.M. Sampoerna Plant Sukorejo-Pandaan
LKP : PT Sentrabumi Palapa Utama Surabaya
Perbaikan quality assurance di PT FSCM Manufacturing Indonesia
Implementasi program 5S di PT Ilufak Plaskaging
Analisis produktivitas dengan metode omax di P.T. Surabaya Perdana Rotopack
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia