Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Author
Jonatan, Ricardo Valentino
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021517/IND/2011
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix : p. 46 - 59
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 59 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02439/11
(T) 658.5 Jon I
-
Unavailable : Removed
Similar Collection
by author or subject
Principles of operations management
LKP : perencanaan persediaan bahan di PT Sumber Makmur Perkasa
Standarisasi berat kalung emas hollow dengan metode PDCA di PT. X
SPC essentials and productivity improvement
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut
LKP : PT USFI
Identifikasi dengan menggunakan value stream mapping waste dan upaya perbaikan kinerja di gudang PT. Y
Pengukuran dan pengendalian biaya kualitas dalam rangka peningkatan efisiensi biaya produksi pada PT Kawan Setia di Gresik