Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia
Author
Permana, Hendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
English
ISBN
-
Series
Tugas Akhir No.01041220/IND/2007
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 42 - 139
Bibliography: p. 41
Abstract
-
Physical Dimension
Number of Page(s)
xii, 139 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01650/08
(T) - 658.5 Per M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manajemen produksi
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Matching supply with demand
Perancangan keseimbangan lintasan produksi di PT. XYZ
Manajemen produksi
Penyusunan prosedur departemen produksi dan departemen QSHE di PT Charoen Pokphand Indoneisa Balaraja Feed Processing