Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia
Author
Permana, Hendra
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
English
ISBN
-
Series
Tugas Akhir No.01041220/IND/2007
Subject(s)
MANUFACTURING PROCESS
PRODUCTION MANAGEMENT
Notes
Appendix: p. 42 - 139
Bibliography: p. 41
Abstract
-
Physical Dimension
Number of Page(s)
xii, 139 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01650/08
(T) - 658.5 Per M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ
Analisa peningkatan output produksi pipa galvanized thread end dengan pendekatan simulasi di PT Spindo unit 3
Minimization the occurences of NQP cubicle in sm6 assembly line at PT. Schneider Electric Indonesia
Peranan anggota keluarga pemilik dalam pengelolaan produksi dan operasional perusahaan keluarga di Surabaya dan sekitarnya
Pengaruh pengendalian persediaan bahan baku HD terhadap kelancaran proses produksi pada PT Logam Jaya Surabaya
The handbook of design management
Optimalisasi layout gudang berdasarkan product family dan trend pengiriman di PT. Trias Sentosa, TBK Sidoarjo
Perancangan tata letak fasilitas dan sistem inventory untuk meningkatkan kapasitas produksi pada departemen Carpenter PT Trias Sentosa, Tbk