Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Minimization the occurences of NQP cubicle in sm6 assembly line at PT. Schneider Electric Indonesia
Author
Atol
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
English
ISBN
-
Series
Tugas Akhir No.01041024/IND/2006
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 97 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01615/06
(T) - 658.562 Ato M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Manajemen produksi
Analisa sistem dan proses produksi lampu halogen di PT Sentral Lighting Indah
Penilaian dan perbaikan kinerja supply chain management dan simulasi kebijakan di PT. X
Sentralisasi proses heat treatment di PT. XYZ
The Manufacturing guides sustainable materials, processes and production
Penentuan waktu output baku dan analisa perhitungan kapasitas output baku produksi unit 3 pt. panggung electric corporation (pec) surabaya
Peningkatan produktivitas di unit audio PT. Panggung Electric Corporation Surabaya
Pengukuran, evaluasi, dan perencanaan terhadap peningkatan produktivitas pada perusahaan roti "limaran" Surabaya