Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa produktivitas tenaga kerja cacat dan normal di PT. Sinar Mulia Harapan
Author
Sultanto, Hokiyono
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010836/ELK/2004
Subject(s)
INDUSTRIAL PRODUCTIVITY
PRODUCTION CONTROL
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 132 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02850/04
(T) 658.54 Sul A
-
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Peningkatan produktivitas di PT. Panggung Electronic Corporation
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Pemilihan alternatif sistem produksi dengan pertimbangan produktivitas dan efisiensi biaya di PT Sepanjang Baut Sejahtera
LKP : PT Kerta Rajasa Raya
Optimalisasi utilitas mesin dan operator di PT. Aditama Raya Farmindo melalui pendekatan simulasi
LKP : di karoseri PT Tugas Anda