Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime pada mesin moulding di PT. X
Author
Ardyanto, Marvin
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra,
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021849/IND/2015
Subject(s)
EFFICIENCY, INDUSTRIAL
PRODUCTION MANAGEMENT
PRODUCTION CONTROL
Notes
Appendix: p. 73-149
. Bibliography: p. 72.
Abstract
-
Physical Dimension
Number of Page(s)
xv, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02352/15
(T) IND 1849
-
Unavailable : Removed
Similar Collection
by author or subject
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Brands laid bare
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Peningkatan produktivitas di unit audio PT. Panggung Electric Corporation Surabaya
Pengukuran kinerja pt cahaya angkasa abadi dengan metode balanced scorecard
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.