Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan kinerja UPPK Petra menggunakan referensi balanced score
Author
Ardianto, Edwin
Additional Author(s)
Chrisiana, Wanda
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/O689/IND/2003
Subject(s)
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 496 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01704/04
(T) 658.542 Ard U
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa keseimbangan lintasan dan pengaruhnya terhadap tata letak pabrik pada pabrik kayu
Perencanaan kebutuhan bahan baku di PT Jaya Makmur
Perbaikan sistem sampling dan peninjauan kinerja QC Line pada PT. X
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi bisnis
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Studi kelayakan perluasan pabrik rotan PT Bumi Rotan Jaya Mojosari
LKP : PT Arika Kharisma Agung
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X