Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Author
Darmawan, Danny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0814/IND/2004
Subject(s)
EMPLOYEES-WORKLOAD
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03741/04
(T) 658.54 Dar P
-
Unavailable : Removed
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya
LKP : PT. Makmur Jaya Kharisma
LKP : PT Arta Glory Buana Sidoarjo
Perancangan sistem produksi dan pengendalian bahan baku perusahaan krupuk
Work systems and the methods, measurement, and management of work
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Analisa pengaruh penggunaan balanced scorecard terhadap keunggulan bersaing dan kinerja perusahaan
Peran internal organisasi dan suasana inovasi untuk peningkatan kinerja UKM