Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Author
Darmawan, Danny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0814/IND/2004
Subject(s)
EMPLOYEES-WORKLOAD
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03741/04
(T) 658.54 Dar P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : mesin pemotongan dan pembentukan kayu di PT Margo Mulya Surya Perkasa
Pengukuran produktivitas kerja karyawan di pabrik kecap cap ratu di Mojokerto
Pengukuran kinerja di PT X dengan metode balanced scorecard
LKP : pengukuran waktu kerja dan peta peta kerja di CV Phoenix Mas Lombok Barat
Analisis kinerja tata usaha jurusan di Universitas Kristen Petra berdasarkan konsep Balanced Scorecard dengan perhitungan Data Envelopment Analysis
Usulan peningkatan kinerja karyawan pada departemen blow molding dan injection molding di PT. X menggunakan metode dilo
Studi pengukuran standar kinerja di sekretariat daerah pemerintah kota Surabaya dengan kriteria MBNQA modifikasi
Analisa keseimbangan lintasan dan pengaruhnya terhadap tata letak pabrik pada pabrik kayu