Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Author
Darmawan, Danny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0814/IND/2004
Subject(s)
EMPLOYEES-WORKLOAD
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03741/04
(T) 658.54 Dar P
-
Unavailable : Removed
Similar Collection
by author or subject
Panduan praktis menyusun analisis beban kerja
Perencanaan produksi perusahaan sepeda
Pembandingan aplikasi metode penjadualan di perusahaan koper
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Identifikasi kebutuhan perkembangan dunia industri terhadap program S2 teknik industri
Teknik penghitungan volume kerja
Perancangan pengukuran standar kinerja Puskesmas pemerintah kota Surabaya dengan mbnqa
LKP : PT Dharma Satya Nusantara Jl. Kapt. Dharmo Sugondo Gresik