Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Author
Darmawan, Danny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0814/IND/2004
Subject(s)
EMPLOYEES-WORKLOAD
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03741/04
(T) 658.54 Dar P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa tata letak ruang Gedung K lantai dasar Universitas Kristen Petra
Perancangan metode pengukuran kinerja jurusan teknik industri Universitas Kristen Petra berdasarkan kriteria MBNQA
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Pengukuran dan analisa kinerja PT "X" dengan metode balanced scorecard
Analisis beban kerja
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Pengukuran kinerja hotel-hotel berbintang di Surabaya dengan menggunakan balanced scorecard sebagai alat pengukur kinerja