Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan leadtime proses pengiriman ekspor barang dengan penggunaan value stream mapping pada divisi sales OEM di PT. X
Author
Lengkong, Ryan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021872/IND/2016
Subject(s)
TIME MANAGEMENT
WORK MEASUREMENT
WASTE MANAGEMENT INDUSTRY
Notes
Appendix: p. 64-77
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 77 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01004/16
(T) IND 1872
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan pengukuran standar kinerja Puskesmas pemerintah kota Surabaya dengan mbnqa
Analisa dan implementasi perbaikan produktivitas dengan menggunakan metode matrix-omax di U.D. Ikan dorang
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Simulasi pertimbangan pertambahan mesin dengan promodel di UD. XYZ
Time and work load management
Dampak peranan konsultan, komitmen manajemen, dan user controller terhadap kinerja perusahaan melalui implementasi TQM
Analisa keseimbangan lintasan untuk kelancaran produksi dengan menggunakan promodel di C.V. Sinar Badja Electric
Peningkatan rendemen barecore di PT. Anugerah Tristar International