Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran waktu kerja di departemen packaging PT Smart. Tbk.
Author
Azteca, Rhenny
Additional Author(s)
Kusuma, Wilson Jonathan
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041289/IND/2008
Subject(s)
MOTION STUDY
TIME MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 88 - 403
Bibliography: p. 87
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 403 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04683/08
(T) - 658.542 Azt P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Peranan situasi kerja yang ergonomik dan penilaian prestasi individu dalam upaya peningkatan kuantitas dan kualitas hasil penyortiran PT Gorom Kencana Surabaya
Penerapan non-financial performance measurement berdasarkan konsep balanced scorecard sebagai informasi bagi manajemen dalam rangka pengukuran kinerja pada.....
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
LKP : PT Almicos Surabaya
LKP : analisa tata letak pabrik perusahaan sepatu UD Happy Surabaya
Pengukuran kinerja dan usulan perbaikan di perusahaan rokok dwi tunggal.