Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Author
Sugiono, Hanna Stephanie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022017/IND/2016
Subject(s)
PERSONNEL MANAGEMENT
PRODUCTION MANAGEMENT
WORK MEASUREMENT
TIME STUDY
Notes
Appendix: p. 52-198
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 198 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02553/16
(T) IND 2017
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis loss material unit resin PT Gajah Tunggal Prakarsa
Operations and supply management
Pengaruh timbal balik antara kepuasan pekerjaan dan kepuasan keluarga (Studi kasus pada P.T. Sukses Jaya di Surabaya)
Hubungan antara seleksi tenaga kerja terhadap produktivitas kerja PT Sinar Purnama Indah Surabaya
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
Upaya peningkatan produktivitas dengan mengurangi waktu tidak produktif pada mesin slitter di PT. Spindo
Perbaikan quality assurance di PT FSCM Manufacturing Indonesia
Pengaruh gaya kepemimpinan dan komitmen organizational karyawan terhadap Organizational Citizenship Behaviour (OCB) pada perusahaan keluarga di Surabaya