Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Author
Sugiono, Hanna Stephanie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022017/IND/2016
Subject(s)
PERSONNEL MANAGEMENT
PRODUCTION MANAGEMENT
WORK MEASUREMENT
TIME STUDY
Notes
Appendix: p. 52-198
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 198 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02553/16
(T) IND 2017
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Performance appraisal
Operations management
Perencanaan produksi di PT, "X"
Pengoptimalan sistem kanban internal lantai 3 di PT. Schneider Electric Manufacturing Batam
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut
Communication as social theory
LKP : PT Sentrabumi Palapa Utama Surabaya