Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Browse by DDC#

41.877 collection(s) found
 
Kepuasan mandor terhadap pola komunikasi pada proyek perumahan
Author(s)
Rachmania, Irma
ISBN
-
Dimension
xiv, 98 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04738/08658.924 Rac KLibrary - 8th FloorUnavailable : Removed
Risk management pada perusahaan kontraktor yang menangani proyek pemerintah
Author(s)
Gunawan, Andre
ISBN
-
Dimension
xiii, 91 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04735/08658.924 Gun RLibrary - 8th FloorUnavailable : Removed
Beginning J2ME platform: from novice to professional
Author(s)
Sing, Li
ISBN
1590594797
Dimension
xxiv, 456 p. / 23 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.05024/08621.38456 Sin BLibrary - 7th FloorAvailable
Operations research: an introduction
Author(s)
Taha, Hamdy A.
ISBN
0131738852
Dimension
1 CD-ROM / 4,75 inch.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00657/09CD 658.4034 Tah OLibrary - 5th Floor/ AVAvailable
2.02685/09CD 658.4034 Tah OLibrary - 5th Floor/ AVAvailable
Operations research: an introduction
Author(s)
Taha, Hamdy A.
ISBN
013202313x
Dimension
xviii, 797 p. / 23 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.00655/09658.4034 Tah OLibrary - 7th FloorAvailable
2.02684/09658.4034 Tah OLibrary - 7th FloorAvailable
Evaluasi overstrength factor kolom beton SRPMK menurut SNI 03-2847-2002 studi kasus: bangunan dengan coakan sudut 20% di wilayah 6 peta gempa Indonesia
Author(s)
Hartanto, Stephanus
ISBN
-
Dimension
xxvi, 157 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04694/08693.852 Har E-Unavailable : Removed
Evaluasi kinerja struktur baja dengan sistem rangka pemikul momen biasa (SRPMB) yang didesain berdasarkan SNI 03-1729-2002 di wilayah 6 peta gempa Indonesia
Author(s)
Stephen
ISBN
-
Dimension
xxv, 129 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04692/08690.852 Ste ELibrary - 8th FloorUnavailable : Removed
Investigasi sifat beton self compacting ditinjau dari sifat material penyusunnya
Author(s)
Syamsu, Harisetyadi
ISBN
-
Dimension
xxiii, 88 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04691/08691.3 Sya ILibrary - 8th FloorUnavailable : Removed
Pelaksanaan struktur baja untuk bangunan industri
Author(s)
Raharjo, Arief
ISBN
-
Dimension
xii, 108 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04690/08624.1821 Rah PLibrary - 8th FloorUnavailable : Removed
Perancangan dan implementasi sistem manajemen mutu ISO 9001:2000 di UD Gajah Mada Karoseri
Author(s)
Adi, Shelmy Kharisma
ISBN
-
Dimension
xiii, 137 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04689/08658.562 Adi PLibrary - 8th FloorUnavailable : Removed
Preferensi potential customer sandal zandilac terhadap produk sandal jepit, selop, dan metal
Author(s)
Anggraini, Christina
ISBN
-
Dimension
xv, 199 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04688/08658.8343 Ang PLibrary - 8th FloorUnavailable : Removed
Perancangan dan implementasi sistem manajemen mutu berdasarkan ISO 9001:2000 di PT. Primabox Adiperkasa
Author(s)
Wijaya, Charlie Harman
ISBN
-
Dimension
xii, 168 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04687/08658.562 Wij PLibrary - 8th FloorUnavailable : Removed
Improvement for foot sealing area at glost selection department in PT Doulton
Author(s)
Jenni
ISBN
-
Dimension
xvii, 217 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04686/08658.562 Jen ILibrary - 8th FloorUnavailable : Removed
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Author(s)
Susanti, Yulia
ISBN
-
Dimension
xiv, 409 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04685/08658.54 Sus PLibrary - 8th FloorUnavailable : Removed
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Author(s)
Wijaya, Yunita
ISBN
-
Dimension
xix, 318 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04684/08658.54 Wij ULibrary - 8th FloorUnavailable : Removed
Pengukuran waktu kerja di departemen packaging PT Smart. Tbk.
Author(s)
Azteca, Rhenny
ISBN
-
Dimension
xviii, 403 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04683/08658.542 Azt PLibrary - 8th FloorUnavailable : Removed
Perancangan metode dan fasilitas kerja pada bagian inspeksi akhir PT Elco Sidoarjo
Author(s)
Hermanus, Suzana Samelina
ISBN
-
Dimension
xi, 125 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04682/08658.542 Her PLibrary - 8th FloorUnavailable : Removed
Perancangan dan implementasi sistem manajemen mutu ISO 9001:2000 di PT Karya Tugas Anda
Author(s)
Tjahjono, Irine
ISBN
-
Dimension
xix, 326 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04681/08658.562 Tja PLibrary - 8th FloorUnavailable : Removed
Perancangan perbaikan dengan lean manufacturing dalam proses produksi job shop pada PT. Alpha Jaya Manunggal Mandiri
Author(s)
Halim, Anita
ISBN
-
Dimension
xiv, 310 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04680/08658.5 Hal PLibrary - 8th FloorUnavailable : Removed
Strategi pemasaran untuk PT. Siantar Top dengan analisa quality function deployment
Author(s)
Gunawan, Yenny
ISBN
-
Dimension
xv, 151 p. / 30 cm.
Exemplar(s)
#Accession No.Call NumberLocationStatus
1.04679/08658.8 Gun SLibrary - 8th FloorUnavailable : Removed