| Perancangan sistem maintenance di PT. Mercu Gramaron- Author(s)
- Putera, Yanto Kianli
- ISBN
- -
- Dimension
- xi, 76 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00578/04 | 658.202 Put P | - | Unavailable : Removed |
| |
| Essentials of Auditing and assurance services- Author(s)
- Arens, Alvin A.
- ISBN
- 0130463035
- Dimension
- xix, 539 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00572/04 | 657.45 Are E | - | Unavailable : Lost |
| |
| Pengukuran kinerja dan usulan perbaikan di perusahaan rokok dwi tunggal.- Author(s)
- Andryanto, Titi
- ISBN
- -
- Dimension
- xv, 117 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00562/04 | 658.542 And P | - | Unavailable : Removed |
| |
| Analisa pengukuran kinerja uppk uk petra menggunakan metode balanced scorecard.- Author(s)
- Waluyo, Yulia
- ISBN
- -
- Dimension
- xii, 113 p. / 30 cm
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00561/04 | 658.542 Wal A | - | Unavailable : Removed |
| |
| Sawyer's internal auditing- Author(s)
- Sawyer, Lawrence B
- ISBN
- 0894135090
- Dimension
- xviii, 1446 p. / 29 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00557/04 | 657.458 Saw S | - | Unavailable : Lost | 2. | 01500/05 | 657.458 Saw S | - | Unavailable : Removed |
| |
| Managing quality- Author(s)
- Foster, S. Thomas
- ISBN
- 0131230182
- Dimension
- xxi, 518 p. / 26 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00556/04 | 658.562 Fos M | - | Available |
| |
| Overview of the sarbanes-oxley act of 2002with othe changes in auditing and the public accounting profession- Author(s)
- Arens, Alvin A.
- ISBN
- 0131447556
- Dimension
- 48 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00555/04 | 657.45 Are O | - | Unavailable : Lost |
| |
| The Enron collapse- Author(s)
- Jenkins, Gregory J.
- ISBN
- 0130463329
- Dimension
- 22 p. / 28 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00553/04 | 657.45 Jen E | - | Unavailable : Removed |
| |
| Events marketing- Author(s)
- Hoyle, Leonard H.
- ISBN
- 047140179X
- Dimension
- xxiv, 224 p. / 24 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00545/04 | 658.456 Hoy E | - | Available |
| |
| Peningkatan produktivitas tenaga kerja dengan job enlargement dan job enrichment di PT. Trias Sentosa Sidoarjo (studi kasus di departemen BOPP).- Author(s)
- Hadiwijaya, Astari
- ISBN
- -
- Dimension
- xii, 96 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00540/04 | 658.306 Had P | - | Unavailable : Removed |
| |
| Analisa penambahan mesin blow molding di pt.xyz.- Author(s)
- Liyanto, Hartono
- ISBN
- -
- Dimension
- xiv, 102 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00539/04 | 658.23 Liy A | Library - 8th Floor | Unavailable : Removed |
| |
| Pengurangan waktu antrian dengan mengoptimalkan pelayanan di Poliklinik Rumah Sakit Santo Vincentus a Paulo Surabaya.- Author(s)
- Pranowo, Daniel
- ISBN
- -
- Dimension
- xii, 43 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00538/04 | 658.40352 Pra P | - | Unavailable : Removed |
| |
| Perancangan fasilitas dan metode kerja yang ergonomis di PT. Friendship.- Author(s)
- Hiendrawan
- ISBN
- -
- Dimension
- xv, 125 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00532/04 | 658.5 Hie P | - | Unavailable : Removed |
| |
| Operation management for competitive advantage- Author(s)
- Chase, Richard B
- ISBN
- -
- Dimension
- 1 CD-ROM / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00531/04 | CD 658.5 Cha O | Library - 5th Floor/ AV | Available |
| |
| Management- Author(s)
- Bateman, Thomas S.
- ISBN
- -
- Dimension
- 1 CD-ROM / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00530/04 | CD 658.4 Bat M/iv-III | Library - 5th Floor / 1smt | Available | 2. | 01034/05 | CD 658.4 Bat M/iv-III | Library - 5th Floor / 1smt | Available |
| |
| Management- Author(s)
- Bateman, Thomas S.
- ISBN
- -
- Dimension
- 1 CD-ROM / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00529/04 | CD 658.4 Bat M/iv-II | Library - 5th Floor / 1smt | Available | 2. | 01033/05 | CD 658.4 Bat M/iv-II | Library - 5th Floor / 1smt | Available |
| |
| Management- Author(s)
- Bateman, Thomas S.
- ISBN
- -
- Dimension
- 1 CD-ROM / 4,75 inch
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00528/04 | CD 658.4 Bat M/iv-I | Library - 5th Floor / 1smt | Available | 2. | 01032/05 | CD 658.4 Bat M/iv-I | Library - 5th Floor / 1smt | Available |
| |
| Perancangan sistem pengendalian kualitas di PT. Bina Satria Abadi Sentosa- Author(s)
- Chandra, Benny
- ISBN
- -
- Dimension
- xiv, 141 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00519/04 | 658.562015195 Cha P | - | Unavailable : Removed |
| |
| Perancangan jadwal preventive maintenance yang optimal di PT. Gunawan Dianjaya Steel- Author(s)
- Wijaya, Iwan Adi
- ISBN
- -
- Dimension
- xv, 151 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00518/04 | 658.202 Wij P | - | Unavailable : Removed |
| |
| Penjadualan produksi flexible flowshops dengan sequence-dependent setup times PT Cahaya Angkasa Abadi.- Author(s)
- Novianti, Hermin
- ISBN
- -
- Dimension
- xiii, 109 p. / 30 cm.
Exemplar(s)# | Accession No. | Call Number | Location | Status |
---|
1. | 00517/04 | 658.53 Nov P | - | Unavailable : Removed |
| |