Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadualan produksi flexible flowshops dengan sequence-dependent setup times PT Cahaya Angkasa Abadi.
Author
Novianti, Hermin
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0779/IND/2004
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00517/04
(T) 658.53 Nov P
-
Unavailable : Removed
Similar Collection
by author or subject
Relokasi pabrik filter dengan mempertimbangkan perencanaan produksi filter di PT Nojorono Tobacco International
Perencanaan produksi di PT, "X"
Penjadwalan produksi dengan menggunakan algoritma heuristik di PT. Kappametal Surya
Perbandingan beberapa initial state yang digunakan pada simulated annealing
Perencanaan kebutuhan material dengan memperhatikan tingkat inflasi di PT Sumber Djaya Perkasa
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Pendekatan tabu search untuk penjadwalan flowshop dengan mesin pararel pada PT. "X"
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle