Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadualan produksi flexible flowshops dengan sequence-dependent setup times PT Cahaya Angkasa Abadi.
Author
Novianti, Hermin
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0779/IND/2004
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00517/04
(T) 658.53 Nov P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Evaluasi dan perbaikan bill of material di PT X.
Upaya penurunan tingkat keterlambatan pemenuhan permintaan di PT. 'X'
Perencanaan dan pengendalian produksi di pt. Interkraft
Upaya pemenuhan target produksi di PT Sidhakarya Anggawa Adipala
Perancangan keseimbangan lintasan untuk meningkatkan kapasitas produksi pada perusahaan meja setrika
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri
Production planning and industrial scheduling