Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"
Perencanaan dan pengendalian produksi giverny 5' bench di CV Tri Star
Production planning and industrial scheduling
The User's journey
Penentuan rute dan penjadwalan kendaraan untuk pengiriman spon di CV. Prima Maju Jaya
Perancangan keseimbangan lintasan untuk proses perakitan timbangan dengan menggunakan algoritma genetik pada perusahaan timbangan "SSS" di Surakarta
Kanban for the shopfloor
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo