Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya penurunan jam kerja Reconstituted Tobacco Clove (RTC) line di primary processing department PT HM Sampoerna, Tbk
Pengukuran kinerja di PT X dengan metode balanced scorecard
Perancangan sistem gudang sub material dan spare part pada depatemen teknik PT Surabaya Wire
Perancangan value stream mapping dan upaya penurunan lead time pada proses pengiriman barang dan proses stock opname di PT X
Perancangan sistem perencanaan produksi PT Daimaster
Perancangan penjadwalan produksi di PT Jatipurna Artindo Design
Perancangan sistem pemenuhan order di PT Steel Pipe Industry of Indonesia
Perancangan sistem manajemen mutu iso 9001:2000 di PT E-T-A Indonesia (Sidoarjo)