Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan production flexibility pada etios di PT Toyota Motor Manufacturing Indonesia
Perancangan value stream mapping dan upaya penurunan lead time pada proses pengiriman barang dan proses stock opname di PT X
Perancangan penjadwalan produksi di PT Jatipurna Artindo Design
The User's journey
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
Perancangan pengendalian persediaan di PT 'XYZ'
Strategi peningkatan kapasitas produksi di PT. Surya Aluminium
Inventory control di PT. XYZ