Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan tenaga kerja dengan menggunakan metode integer linear programming dan heuristik di perusahaan plastik "X"
Implementasi sistem manajemen mutu ISO 9001:2000 di PT. E-T-A Indonesia
Perancangan sistem PPIC (production planning, inventory and control) produk flusher di PT. Surya Indomental Semesta
Perancangan sistem production planing and inventory control produk air minum dalam kemasan PT Atlantic Biruraya
Komunalitas part di PT Insera Sena
Perencanaan ulang layout dan material handling di PT Smart Tbk. untuk meminimumkan waktu perpindahan
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Perancangan tata letak fasilitas melalui pendekatan simulasi di PT Sakata Angkasa