Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan produksi di cv sujaru.
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Perancangan sistem perencanaan dan pengendalian produksi di PT. "X"
Perencanaan produksi cat tembok di PT. Warnatama Cemerlang
Penentuan temperatur optimal metode SA-MDJ dibandingkan dengan metode NEH untuk penjadualan flow shop
Peranan linear programming untuk memaksimumkan laba dalam produk mix pada PT. "X" di Gresik
Production and inventory management
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya