Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan lead time produksi panel low voltage menggunakan material replenishment di PT. Schneider Indonesia
Author
Santoso, Robert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021424/IND/2010
Subject(s)
MATERIALS HANDLING
PRODUCTION PLANNING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
x, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02054/10
(T) 658.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi dan perbaikan bill of material di PT X.
Perencanaan dan pengendalian produksi di PT. Sabda Panca Elektronik
Algoritma branch and bound dan algoritma genetika untuk penjadwalan flowshop dengan fungsi tujuan ganda
Perancangan sistem Pengendalian Persediaan Bahan Baku di PT. Multiplast Jaya Tatamandiri
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya
Upaya meminimasi bottle-neck di lini produksi PT. Halimjaya Sakti dengan pendekatan simulasi
Analisis komponen kritis supply chain management terhadap performance perusahaan
Pembuatan prosedur standar operasi dan instruksi kerja pada departemen PPIC PT Trias Sentosa