Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian produksi giverny 5' bench di CV Tri Star
Author
Kristanti, Ira
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041069/IND/2006
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 188 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04045/06
(T) - 658.5 Kri P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis sistem quality control pada CV. Gema Sutera
Analisis perbandingan metode penjadwalan batch multi item dengan kombinasi algoritma tabu search dan ant colony (studi kasus pada CV Sinar Baja Electric)
Implementasi module sales and distribution (sd) enterprice resource planning (erp) dengan mfg pro ver eb2 (qad) di unit cabang jakarta 1 dan service station jakarta 1 pt. akari indonesia
Penjadwalan produksi dengan algoritma ant colony di FSCM Manufacturing Indonesia plant 4
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya
Penurunan tingkat kecacatan di CV Surya Mas
Operations and supply chain management
Pengukuran, evaluasi dan perencanaan peningkatan produktivitas pada PT. "X"