Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian produksi giverny 5' bench di CV Tri Star
Author
Kristanti, Ira
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041069/IND/2006
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 188 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04045/06
(T) - 658.5 Kri P
-
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi keterlambatan pengiriman produk departemen produksi extrussion blow molding di PT X Surabaya
Perancangan sistem hazard analysis critical control point (haccp) di pt multi aneka pangan nusantara
Analisa efisiensi teknis dan ekonomis dari proses produksi pada PT. Fendi Furindo
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Perancangan sistem ERP di PT Mulcindo
Made-to-order lean
Perancangan sistem pemenuhan order di PT Steel Pipe Industry of Indonesia