Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian produksi di pt. Interkraft
Author
Hananta, Hendra Budhipramana
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0716/IND/2003
Subject(s)
PRODUCTION CONTROL
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
x, 67 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01144/04
(T) 658.503 Han P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Peningkatan produktivitas di unit audio PT. Panggung Electric Corporation Surabaya
Upaya penurunan downtime pada mesin double deck di PT X
Upaya penurunan jam kerja Reconstituted Tobacco Clove (RTC) line di primary processing department PT HM Sampoerna, Tbk
Perancangan perencanaan produksi dan inventory control untuk mengurangi lead time produk pada PT Berkat Anugerah Jaya
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Perencanaan produksi di CV. Sidodadi Jaya
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya