Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya penurunan downtime pada mesin double deck di PT X
Author
Gunawan, Oscar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021474/IND/2010
Subject(s)
PRODUCTION CONTROL
EFFICIENCY, INDUSTRIAL
PRODUCTION MANAGEMENT
Notes
Appendix : 60 - 81
Bibliography : p. 60 - 81
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 81 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03848/10
(T) 658.56 Gun U
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan keseimbangan lintasan produksi pada perusahaan koper
Brand babble
Perencaaan kebutuhan kertas, grain dan lem resin untuk produk amplas H231 di PT Norton Hamplas Industries
Perancangan perbaikan dengan lean manufacturing dalam proses produksi job shop pada PT. Alpha Jaya Manunggal Mandiri
Penurunan biaya kualitas di PT X
Perancangan pengendalian inventory system di PT X Surabaya
Perancangan alat ukur penilain kinerja di PT X dengan menggunakan balanced scorecard
Perencanaan kebutuhan kapasitas produksi di PT Bahari Mitra Surya